Preparing the Floor for the First Workshop Wall | Trailer Machine Shop

Fix it All Podcast 1 months ago

Description

Before I can build the first wall of my trailer machine shop, the edge of the new floor needs to be finished and reinforced.

In this episode, I trim 12 inches (30.5 cm) of excess OSB flooring, install a rim board that ties all the floor joist ends together, reinforce the edge that will support the wall, and calculate the correct wall height to fit beneath the existing roof structure.

This may not be the most dramatic stage of the project, but it is an important step that connects the completed floor to the upcoming wall framing.

The 6,000 lb (2,720 kg) Herbert lathe is already standing on its new permanent floor. Now the enclosed workshop is beginning to take shape.
* * *
In this episode I'm preparing the edge of a new floor to install the first workshop wall.

I'm cutting off an extra 12 inches (30.5 cm) of OSB, installing end caps to tie the ends of all the floor joists together, bracing the edge for the future wall, and calculating the required framing height for the existing roof.

This may not be the most spectacular stage of construction, but without it, the rest of the process would feel confusing and incomplete.

The 6,000-pound (2,720 kg) Herbert lathe is already on its permanent floor. Now a real workshop is beginning to emerge around it.

#TrailerMachineShop #WorkshopBuild #WallFraming