Description
Two heavy machines are suspended in the air while I build the new floor frame directly underneath them.
The Simmons turret lathe and Siber Hegner RB-1 milling machine weigh approximately 5,000 lb (2,270 kg) combined. After moving them under the roof, I begin constructing the second half of the permanent workshop floor using massive support beams and heavy floor joists.
Building beneath suspended machinery certainly makes the job more complicated, but it allows me to place the machines exactly where they need to be before completing the floor.
At the end of the day, I cover everything with a tarp. The following day brings continuous rain and gives my temporary covering a proper test—it works perfectly.
This removable workshop continues to grow one section at a time.
Два тяжёлых станка висят в воздухе, пока я строю раму нового пола непосредственно под ними.
Общий вес токарного станка Simmons и фрезерного станка Siber Hegner RB-1 составляет примерно 5000 фунтов (2270 кг). После перемещения станков под крышу я начинаю строить вторую половину постоянного пола мастерской из массивных несущих балок и мощных поперечных лаг.
Строить под подвешенными станками, конечно, сложнее, но так я могу заранее установить их точно на предназначенные места, а затем закончить пол непосредственно под ними.
В конце рабочего дня я накрыл всё тарпом. Весь следующий день шёл дождь, который как следует проверил моё временное укрытие — оно сработало отлично.
Разборная мастерская продолжает расти — секция за секцией.
#TrailerMachineShop #MachineShop #FloorFraming
