Welcome to YTUnity

One free SpiderTaz Network account works across every network site.

Closing In My Workshop Before the Damp Takes Over | Walls & Polycarbonate Windows

Fix it All Video 13 days ago

Description

The workshop is getting walls and its first polycarbonate windows—but the damp weather is catching up.

In this episode, I mount the electrical panel for future breaker connections, buy 14 sheets of polycarbonate, and install Barricade building wrap on the front and rear walls.

I also cut and test-fit the first window panels: an angled piece to follow the roof slope at the front, and straight 4-foot-wide panels at the rear.

At the end, I show how fog and moisture are settling on the machines. Time to pick up the pace, finish enclosing the workshop, and install the double entry doors.

Another step in building my trailer machine shop!

The workshop is gradually being closed with walls and acquiring the first polycarbonate windows, but the damp weather is already forcing it.

In this episode, I install an electrical panel for future wiring to the circuit breakers, buy 14 sheets of polycarbonate, and cover the front and back walls with Barricade wind and moisture barrier membrane.

I cut and fit the first window panels: at the front, at an angle to match the roof pitch, and at the back, straight panels 4 feet wide (approximately 1.2 meters).

At the end, I show how fog and moisture settle on the machines. I need to speed up: close all the walls and install the double entry door.

Another stage of building my trailer workshop!

#WorkshopBuild #MachineShop #Polycarbonate

Featured creators

Creators on the SpiderTaz Network

Become a creator →