Description
Another step forward in building my trailer machine shop: closing the floor gap and moving a 1,200 lb (544 kg) metal table inside!
The video starts with moisture still collecting on the machines. I close the 1-foot-wide gap between the trailer floor and the beam-supported platform, continuing the work of enclosing the shop.
Then it's time to move the heavy table out from under the storage shelter, load it onto a trailer, bring it over to the workshop, and unload it. With the doors not installed yet, I use the open wall section and a temporary ramp to roll it inside.
To help spread the load from the casters and protect the plywood floor, I lay down sheets and offcuts of ¼-inch (6 mm) high-density polyethylene (HDPE) along the route.
This isn't going to be a workbench — it will become the base for a future machine project. Its machined metal top is 1¼ inches (32 mm) thick.
The table is finally inside, and the workshop is one step closer to being ready for work!
* * *
Ещё один этап строительства моей мастерской на прицепе: закрываю щель в полу и перевожу внутрь металлический стол весом 1,200 фунтов (544 кг)!
В начале видео показываю сырость, которая всё ещё собирается на станках. Закрываю полосу шириной 1 фут (30 см) между полом прицепа и площадкой на балках, продолжая зашивать мастерскую.
Затем достаю тяжёлый стол из-под навеса, гружу на прицеп, подвожу к мастерской и выгружаю. Пока двери ещё не установлены, использую открытый участок стены и по временной рампе закатываю стол внутрь.
Чтобы распределить нагрузку от роликов и защитить фанерный пол от продавливания, подкладываю по пути листы и обрезки полиэтилена высокой плотности — HDPE толщиной ¼ дюйма (6 мм).
Этот стол не будет верстаком — он станет основой будущего станка. Толщина его фрезерованной металлической столешницы — 1¼ дюйма (32 мм).
Стол наконец в мастерской — продолжаю готовить помещение к работе!
#WorkshopBuild #MachineShop #MovingHeavyEquipment
