Bathroom Remodel, Vanity, LED Mirror Cabinet, Shower Faucet, Heated Towel Rack & Final Touches

Fix it All Video 20 days ago

Description

Bathroom Remodel – Part 7 (Final Episode)

The bathroom remodel is finally complete!

In this final episode, I finish the project by installing the shower faucet trim, tub spout, heated towel rack, bathroom accessories, shelves, mirror cabinet, and completing all of the final finishing details.

This project included:

✔ Shower faucet installation
✔ Heated towel rack
✔ Mirror cabinet with LED lighting
✔ Bathroom accessories & shelves
✔ Polymer epoxy grout
✔ Final caulking and adjustments
✔ Complete bathroom reveal

Thank you for following this complete bathroom remodel series from demolition to the finished bathroom.

After more than 144 hours of work, 540 tiles, 117 miter cuts, 51 trips to the job site, and countless details...

The project is finally complete.
* * *
Ремонт ванной комнаты — Часть 7 (Финальная)

Проект полностью завершён!

В этой серии выполняются все заключительные работы:

✔ установка крана ванны/душа;
✔ зеркального шкафчика с подсветкой;
✔ полотенцесушителя;
✔ полок и аксессуаров;
✔ затирка полимерной затиркой;
✔ герметизация;
✔ финальная сборка и уборка.

За время этого проекта было выполнено:

✔ более 144 часов работы;
✔ уложено 540 плиток;
✔ выполнено 117 запилов под 45°;
✔ 51 выезд на объект.

Спасибо всем, кто прошёл этот путь вместе со мной!