Bathroom Remodel – Fixing Subfloor, HardieBacker, Tile Install & Tub Faucet

Fix it All Video 2 months ago

Beschrijving

Part 3 of the bathroom remodel. Subfloor leveling, toilet flange reinforcement, HardieBacker install, floor tile and wall-mounted tub faucet installation.
From tub and floor demo alone: 0.54 tons (1,080 lbs) of debris removed.
No talking — just real work.