JAGER PRO® | M I N E ® Gate Upgrade Overview

JAGER PRO® Guide 8 months ago

Description

This week’s mission focuses on removing two gates from South River which have been in the field for eight years and updating them with the latest electronic latches. The JAGER PRO Manufacturing Department will take us through the various upgrades made to both gates and control box. Then, Rod reinstalls gates at South River and demonstrates how to place the control box, Solar Power Supply and cameras above the Flint River five-foot flood line. He also shows users how to position equipment to power the JAGER Pro Live Video camera and control box from the same Solar Power Supply to run a permanent trap indefinitely.