(ep. 3) Making Progress, but got BAD NEWS... Abandoned Building Shop Renovation

Modustrial Maker Video 10 months ago

Description

In this abandoned building shop renovation episode, we’re replacing the facade, demoing the floor, and installing a mini-split. Check out MRCOOL mini-splits: https://tinyurl.com/m3c4syzr

In addition to the renovation updates, I also have to deal with some bad news - the possibility I bought a toxic waste dump. As a result, I have to deal with an expensive environmental assessment that has delayed the renovation quite a bit.

// Rockler Products
Dust Right Air Filtration Unit: http://bit.ly/41XnawM
Rock-Steady Fold Down Outfeed table: http://bit.ly/4mEicx9
Sure Lock Tape measure: http://bit.ly/4mxIOjs
Dust-Rite Tool Activated HEPA Dust Extractor: http://bit.ly/4mZCUrg


00:00 Introduction
00:20 Facade Demolition
02:26 Glass Facade Installation
04:32 Tile Floor Demolition
06:05 MRCOOL ad break
07:05 Bad News (Toxic Chemicals under Building)
11:34 Phase I Environmental Assessment
15:33 Phase II Environmental Assessment
21:05 HVAC overview
23:30 Mini-split Installation
30:31 Results of Environmental Assessment